Home » Shop » Marine Electrical » Glendinning Cablemaster Installation – Hawse Pipe Components, Pipe Extension Kit – Horizontal (3 ft); for Long Lead-Ins

Glendinning Cablemaster Installation – Hawse Pipe Components, Pipe Extension Kit – Horizontal (3 ft); for Long Lead-Ins

Original price was: $148.74.Current price is: $113.57.

Sale!
SKU: VDM 387437 Category:

Cablemaster Installation – Hawse Pipe Components, Pipe Extension Kit – Horizontal (3 ft); for Long Lead-Ins

Enhance your vessel’s power cord management with the Cablemaster Installation Kit. This essential accessory ensures efficient routing of your power cord from the hawse pipe entry to the storage area, optimizing space and functionality.

  • Horizontal Extension Kit: Ideal for situations where storage space is limited directly below the Hawse Pipe, allowing for further inboard cable storage.
  • Inboard Installation: This accessory facilitates the installation of the Power Unit farther inboard from the Hawse Pipe Assembly cable entrance.
  • Contents:
    • (1) 36″ section of 3″ Sched 40 PVC pipe
    • (2) U-Clamps
    • (1) Aluminum Connector Link for connecting to the next system component, such as the Power Unit.

Brand: Glendinning

Product Number: 04043

Glendinning SKU: 04043
VDM – Reya SKU: 387437